Reorder point calculator

Calculate when to reorder and compare supplier lead times and stock buffers.

Demand and replenishment

Use one product and the same counting unit throughout.

Calendar days from ordering until stock is ready to sell.

Your whole-unit buffer beyond expected demand.

Compare another scenario

Keep daily demand unchanged for this comparison.

Check available stock

Enter sellable stock available now, before the incoming delivery.

Include one confirmed delivery. Leave blank if there is none.

Required with incoming stock. Use 0 if available now.

Current scenario

Reorder point

108 units

84 units of expected demand plus 24 safety-stock units.

Reorder point: 108 units. Alternative scenario: 156 units. On-hand stock covers 5 days.

Replenishment comparison

Current and alternative replenishment scenarios
MeasureCurrentAlternative
Lead time7 days10 days
Expected demand84 units120 units
Safety stock24 units36 units
Reorder point108 units156 units

Stock coverage

Stock coverage at the entered daily demand
MeasureResult
On-hand cover5 days
Continuous cover13.33 days
Safety-stock cover2 days
On hand + incoming160 units

The delivery arrives within on-hand cover, extending continuous cover to 13.33 days.

Demand during lead time

The reorder point is expected demand during supplier lead time plus your chosen safety stock. Multiply average daily demand by lead time in days, then add the buffer.

In this hypothetical example, 12 units per day over seven days uses 84 units. Adding 24 safety-stock units gives a reorder point of 108 units.

The calculator rounds the final threshold up to a whole unit. At 2.25 units a day, 3.5 days of lead time and two safety-stock units, the unrounded total is 9.875. The reorder point is 10 units.

Small quantities use thousandths of one stock unit.

Use the same counting unit throughout. If demand is in cartons, enter safety stock and stock on hand in cartons too. Keep demand and lead time on the same calendar-day basis.

Compare replenishment scenarios

A longer supplier lead time raises the reorder point because stock must cover more days of demand. More safety stock raises the threshold by the extra units you enter.

At 12 units per day, increasing lead time from seven to 10 days adds 36 units of expected demand. Keeping the 24-unit buffer gives a reorder point of 144 units.

The starting alternative also increases the buffer to 36 units, giving a 156-unit reorder point. Change one assumption at a time to see which change increases the stock threshold.

Safety stock is an input you choose. This calculator does not select a statistical service level or calculate an economic order quantity. The reorder point tells you when to order under your assumptions, while the order quantity needs its own decision.

Read stock coverage

Assumes constant daily demand and one delivery. A delivery at the depletion time is available before the next sale. Coverage rounds to two decimals.

On-hand coverage is sellable stock divided by average daily demand. With 60 units and demand of 12 units a day, the starting stock covers five days.

A confirmed delivery of 100 units in four days arrives before that stock runs out. Continuous cover becomes 13.33 days at the same demand rate.

If that delivery instead arrives in six days, the first stockout remains at five days. The combined 160 units still includes stock that is unavailable during the gap.

Zero demand has no depletion time in this model. Zero lead time leaves the chosen safety stock as the reorder point. Leaving stock on hand blank skips coverage without changing the threshold.

Average demand can understate a seasonal peak or a promotion. Use demand for the coming selling period and compare a slower delivery before setting a purchasing rule.

This is a planning threshold under fixed assumptions. It does not track live sales, reservations or supplier delays. Subtract committed stock before entering sellable stock on hand, and review receipt timing separately for multiple deliveries.